Advanced planning process and happier planners

  • CLIENT

    Orthex Group

  • PROJECT

    Implementation of a system capable of providing more features, a higher level of automation, and the ability to plan production for a multi-plant network, both at an operational and strategic level, providing strong support to the planning and purchasing teams.

Company

Orthex Group is a leading producer of household products in the Nordic countries, operating in a sector with high customer demands and short delivery times. The company’s growth and the increase in large orders have added complexity to the supply chain, putting pressure on the production planning process and, consequently, the planners involved.

 

The Challenge

For Orthex, large unexpected orders are common and usually have short delivery times (ranging from 48 hours to a week). Such short deadlines require production flexibility and rapid adaptation. To ensure customer satisfaction and product availability, lean production becomes essential. As Orthex grew, the complexity of production and factory planning increased, becoming more time-consuming. Before using Compass10, Orthex used another production planning application. The company’s current needs and the goal of ensuring sustainable growth required implementing a system capable of providing

more functionality, a higher level of automation, and the ability to plan production for a multi-plant network, both operationally and strategically, offering valuable support to planning and purchasing teams. In summary, Orthex faced: Growth of the company and increased supply chain complexity. The previous planning method was unsustainable with available resources. The existing planning system could not meet future needs.

 

Results

  • Faster and smoother planning process.
  • Freed-up time for analyzing production exceptions.
  • Increased perception of production control.
  • Happier production planners with more versatile workdays.

CWith the introduction of the Compass10 Planning & Scheduling system, Orthex achieved several results, including increased speed and smoothness in the planning activity, making the planner’s job easier. Additionally, the planning process became more robust and structured compared to the previous application, which relied more on manual control.

“Using Compass10 has given me a greater sense of control, which is important for someone in my role. I spend less time planning and can dedicate more time to analyzing exceptional cases such as late orders and backlogs.” Therese Dahl, Production Planner, Orthex Group

 

Credits

The project was carried out in collaboration with our partner Optilon.